NFPA 12-2005 二氧化碳灭火系统.pdf
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NFPA 12-2005 二氧化碳灭火系统 12 2005 二氧化碳 灭火 系统
- 资源描述:
-
Tentative Interim Amendment
NFPA 12
Standard on Carbon Dioxide Extinguishing Systems
2005 Edition
Reference: 1.3.5
TA 05-2(NFPA 12
(SC0-7-13) Ilog NO.842)
Pursuant to Section 5 of the NFPA Regulations Governing Committee Projects, the National Fire
Protection Association has issued the following Tentative Interim Amendment to NEPA 12 Standard on
Car bon Dioxide Extinguishing Systems, 2005 edition. The TIA was processed by the Gaseous Fire
Extinguishing Systems Committee, and was issued by the Standards Council on July 28, 2006, with an
effective date of August 19, 2006
A Tentative Interim Amendment is tentative because it has not been processed through the entire
standards-making procedures. It is interim because it is effective only between editions of the standard
A TIA automatically becomes a proposal of the proponent for the next edition of the standard; as such, it
then is subject to all of the procedures of the standards-making process
Revise section 1. 3. 5 to read as follows
1. 3. 5 These upgrades shall be completed by Ahgtst7, 2006 December 31, 2008
Copyright@ 2006 All Rights Reserved
NATIONAL FIRE PROTECTION ASSOCIATION
Provided by IHS under license with NFPA
No reproduction or networking permitted without license from HS
Not for Resale
heStandardisdownloadedfromStandardSharing
N
Tentative Interim Amendment
NRPA 12
Standard on Carbon Dioxide Extinguishing Systems
2005 Edition
Reference: Figures 4.3.2.3.4 and 4.3.2.3.5
TIA 05-1 (NFPA 12)
(6C05-10-14/T1A Log 827)
ursuant to Scction 5 of the NFPA Regulations Governin mmittee Projects, the National Fire Protection Association has issued the
to lowing Tentative Interim mendment to MIP 1, Standard on Carbon ioxide t wishing stems, 2005 edition. The T was
processed by the Gaseous Fire Extinguishing Systems Committee, and was issued by the Standards Council on October 27, 2005, with an
effective date of November 18. 2005.
A Tentative Interim Amendment is tentative because it has not been processed through the entire standards-making procedures. It is
interim because it is effective only between editions of the standard. A TIA automatically becomes a proposal ofthe proponent for the
next edition of the standard; as such, it then is subject to all of the procedures of the standards-making proces
1. Change the wordcaution'in Figures 4.3.2.3.4 and 4.3.2.3.5 i0 Warning
Copyright G 200> All Rights Re
ATONAL FIRE PROTECTION ASSOCIATION
Provided by IHS under license with NFPA
No reproduction or networking permitted without license from HS
Not for Resale
heStandardisdownloadedfromStandardSharing
展开阅读全文
文档分享网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。



链接地址:https://www.wdfxw.net/doc92791141.htm