TDI train - Infrastructure Electrical System Installation
MV Cable Pulling Construction Plan
TDI联合装置-基础设施电气系统安装
中压电缆敷设施工方案
B
11/30/2009
ISSUED FOR COMMENTS
A
11/26/2009
ISSUED FOR COMMENTS
Rev
Date
DD/MM/YY
STATUS
PREPARED BY
CHECKED BY
APPROVED BY
DOCUMENT REVISIONS
目 录
Content
一. 概况 OVERVIEW 3
1.1 工程概况 PROJECT OVERVIEW 3
1.2 施工范围 SCOPE OF WORK 3
二.编制依据 COMPILATION BASIS 4
三. 施工工艺流程:CONSTRUCTION PROCESS 4
四. 前期准备 PREPARATION 4
4.1 技术准备 TECHNICAL PREPARATION 4
4.2 材料准备MATERIAL PREPARATION 5
4.3 主要机具准备 MAIN EQUIPMENT PREPARATION 5
4.4 作业环境准备 WORK ENVIRONMENT PREPARATION 6
五. 敷设施工 WORK OF CABLE PULLING 6
5.1 电缆敷设施工工序WORK PROCEDURE 6
5.2 机具布置 LAYOUT OF TOOLS 6
5.2.1 电缆的搬运及支架架设CABLE REMOVAL AND CABLE TRAY 6
5.2.2 卷扬机与滑轮的布置 WINCH AND PULLEY ARRANGEMENT 6
5.3 电缆展放LAY-OFF CABLE 10
5.4 电缆敷设、固定CABLE LAYING AND FIXING 12
六. 覆砂盖砖SPREAD SAND AND COVER BRICKS 12
七. 回填土BACKFILL EARTH 13
八. 埋标桩BURYING STAKE 13
九. 挂标志牌HANGING SIGNS 13
十. 质量控制QUALITY CONTROL 13
10.1 主控项目MASTER ITEMS 13
10.2 一般项目GENERAL ITEMS 14
十一. 成品保护FINISHED PROTECTION 14
十二. 质量记录QUALITY RECORD 14
12.1 质量保证资料QUALITY ASSURANCE INFORMATION 14
12.2 施工记录CONSTRUCTION OF RECORD 15
十三. 安全生产、文明施工要求和措施 SAFETY AND CIVILIZED CONSTRUCTION REQUESTS AND MEASURES 15
一. 概况 Overview
1.1 工程概况 Project Overview
项目名称: TDI联合装置厂区中压电缆敷设施工。Project name: TDI Train Plant Medium Voltage Cable Pulling Work.
本工程涉及三个变电站,分别是现有的220/35kV A472变电站、现有的35/10kV B301S变电站以及新建的35/10kV C581变电站,工作内容为三个变电站之间和从三个变电站接至MV用户的电力电缆、控制电缆、接地电缆的敷设。The project involves three substations, namely the existing 220/35kV A472 substation, the existing 35/10kV B301S the 35/10kV C581 substation and a new substation. This is the power, control and grounding cable pulling among three substations and for MV users connected to the three substations.
1.2 施工范围 Scope of Work
1) A472建筑(220/35kV变电站)出线回路:A472 Building(220/35kV substation) outlet circuit
由A472变电站引出3路35kV出线。其中:
一路引至B301S建筑(35/10kV变电站)原1#主变,原1#主变电缆将抽出,与新增4#主变连接;另两路引至35/10kV C581变电站1#主变和2#主变。回路采用FS-YJY-26/35kV-1*300mm2单芯电缆,直埋敷设。去C581的两路35kV线路,敷设时沿不同路径,以避免两回线路同时受损。Pull three 35V outgoings from A472 substation. Of which: The first outgoing is led to B301S Building (35/10kV substation) the original one # main transformer, pull the original one # main transformer cable out, and connect to the adding 4 # main transformer; the other two outgoings are led to 35/10kV C581 # 1 and substation 2 # main transformer. Use FS-YJY-26/35kV-1 * 300mm2 single-core cables for Loop and buried pulling. Two 35kV lines to C581 are laid along different paths to avoid damage of the two loops.
2) B301S建筑(35/10kV变电站)出线回路:B301S building (35/10kV substation) outlet circuit:
由B301S变电站引出7路10kV出线。全部引至B399中心制冷站。回路采用10kV截面为95mm2的三芯铠装电缆,由B301S南面现有的电缆井引出直埋至装置。Pull 7 10kV outgoings from B301S substation to B399central refrigeration station. Loop uses 10kV three-core armored cable with cross-section 95mm2 and pull out from the existing cable well in the south of B301S then buried lay to the device.
3) C581建筑(35/10kV变电站)出线回路:C581 building (35/10kV substation) outlet circuit:
由C581引出10路10kV线路,分别为A507的四台变压器,B551的两台变压器,B553TDA装置氢气压缩机2台,C521盐酸装置氯气压缩机1台,盐酸压缩机1台提供电源。其中,变压器回路采用10kV截面为185mm2的三芯铠装电缆展开阅读全文