Requirements for Boiler and Pressure Vessel Manufacture Licensing
Chapter I General Provision
Article I. The Requirements for Boiler and Pressure Vessel Manufacture Licensing
are specially formulated in accordance with relevant requirements in the Supervision
Administration Regulation for Manufacture of Boiler and Pressure Vessel (hereinafter
referred to as the"Administration Regulation "
Article 2. The Requirements apply to all boiler and pressure vessel product
manufacturers which specifies in"Administration Regulation(hereinafter referred to
as manufacturer
Article 3. The Requirements are comprised of the resources requirements for boiler
and pressure vessel manufacture licensing, quality management system requirements
and boiler and pressure vessel safety quality requirements. The resource requirements
include basic requirements and specific requirements. The basic requirements are the
general requirements for producing all kinds of boiler and pressure vessel products
and the specific requirements are the specific requirements for producing relevant
level of boilers and pressure vessels, all of which should be met by the manufacturers
simultaneousl
Article 4. Manufacturer shall establish, and continuously and effectively implement a
sound quality management system suitable for its boiler and pressure vessel products
In order to verify the control capability of its quality management system for boiler
and pressure vessel products, the manufacturer shall have enough practice in
continuous producing boiler and pressure vessel products
Article 5. The non-destructive examination (NDE), heat treatment, and physical and
chemical property examination can be performed either by manufacturer itself or b
subcontractors with relevant qualification or competence. when the manufacturer
signing consignment agreement with them. The consignment agreement has to
forward to the license-issue department on file. The consignee shall issue the related
report of the consigned work to the manufacturer and the manufacturer shall be
responsible for the quality control of the consigned work, which should be included in
the quality management system for boiler and pressure vessel of the manufacturer
The requirements of the specific requirements for resource shall not be consigned
Article 6. Manufacturer shall have a capability of producing main body(shell and/or
head of boiler and pressure vessel products independently. It is unacceptable to
consign all pressure parts of boiler and pressure vessel products to the subcontractors
hapter 2 Resources Requirements for Boiler Manufacture Licensing