书签 分享 收藏 举报 版权申诉 / 18

类型SEMI E105-1000 PROVISIONAL SPECIFICATION FOR CIM FRAMEWORK.pdf

  • 上传人:贝西贤泽
  • 文档编号:99786108
  • 上传时间:2017-06-17
  • 格式:PDF
  • 页数:18
  • 大小:208KB
  • 配套讲稿:

    如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。

    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    SEMI E105-1000 PROVISIONAL SPECIFICATION FOR CIM FRAMEWORK E105 1000
    资源描述:
    sem
    SEMI E'105-1000
    PROVSIONAL SPECFCATON FOR CM FRAMEWORK SCHEDULNG
    COMPONENT
    ification was technically
    d by the Global Information & Control Committee and is the direct
    responsibility of the North American In formation Control Committee. Current edition approved by the
    NorthAmcricanRcgionalStandardsCommittcconAugusl28,2000Initiallyavailablcalwww.scmi.org
    Scptcmbcr 2000, to bc published October 2000
    components of the CIM Framework. This illustration
    1 Purpose
    does not reflect all of the many inputs to the Scheduling
    he Scheduling Component supports Factory
    Component that are required to provide it with the
    Operations, Material Transport and Storage, Production current status of the factory resources
    Machine, and Equipment Tracking and Maintenanc
    2.2 As described in this standard, the Scheduling
    components by ordering, in time, jobs that p
    Rocess
    Component produces activity option and activit
    on equlpment, move material, and maintain forecast lists. These lists are produced by combining
    the factory model and status information from other
    demand, equipment and material state, process flows,
    throughput bottlenecks, operational policy and
    components with scheduling policies in the Scheduling
    Component. For example, the Scheduling Componen
    constraints, and other information to recommend jobs
    combines data from the Specification Component on
    that maximize effective utilization of factory resources how products are made with status data from the
    to satisfy product demand and planned objectives
    Equipment and Product Management Components to
    1.2 Increased control over operations requires an give activity options for a machine
    active Scheduling Component that can respond
    2.3 The Factory Operations Comp onent uses the
    factory events and changes in state and dynamica
    ally Scheduling Component services to orchestrate the man
    adjust the schedules for material processing, material
    agement of machines and production of lots. For exam
    transport and equipment maintenance. The Schedulin
    ele, when a tool becomes available, Factory Operations
    Component can react to inventory levels of material in
    uses the Activity Options list to select the next lot to
    the factory to adjust priorities to minimize queue sizes
    process on the tool. Factory Operations then works
    and ensure that use of bottleneck equipment is opti
    with other components to execute the production job for
    mized to keep WTP inventory levels at desired levels
    the lot on the machine. Executing the production job
    3 The Scheduling Component can minimize turn changes the state of lot and tool in other components
    around time(TAT)by coordinating material transport These status changes are then used by the Scheduling
    ( for substrates and durables )with processing to reduce Component when it produces new activity lists
    equipment idle time. The Scheduling Component can
    2. 4 The Scheduling Manager supp orts Factory
    sequence activities to minimize setup tim
    can aso
    Operations by providing an answer to questions like
    respond to scheduled and unscheduled equipment What is next for this material or resource? The
    down-time to minimize impact on turn around time. In
    answer may be based on evaluation of current or future
    addi
    展开阅读全文
    提示  文档分享网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:SEMI E105-1000 PROVISIONAL SPECIFICATION FOR CIM FRAMEWORK.pdf
    链接地址:https://www.wdfxw.net/doc99786108.htm
    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    版权所有:www.WDFXW.net 

    鲁ICP备09066343号-25 

    联系QQ: 200681278 或 335718200

    收起
    展开