QGDW1799.3-2015国家电网公司电力安全工作规程第三部分水电厂动力部分.doc
ICS 29.240Q/GDW国家电网公司企业标准Q/GDW 1799.3 2015国家电网公司电力安全工作规程 第三部分:水电厂动力部分State Grid Corporation of China working regulations of power safety part 3: Hydropower and machine section2015 - 04 - 10 发布2015 - 04 - 10 实施国家电网公司 发 布1Q/GDW1799.3 2015目次前言 1范围 12规范性引用文件 13术语和定义 14总则 15保证安全的组织措施 26保证安全的技术措施 117一般安全措施 138水轮机(水泵)的工作 179水轮发电机(电动机)的工作 2110热工元器件的工作 2211水工金属结构 2312电站公用辅助设备 2513水工工作 2814起重与运输 3215高处作业 4116焊接、切割和热处理作业 46附录 A(资料性附录) 现场勘察记录格式51附录 B(资料性附录) 发电厂水力机械工作票格式 52附录 C(资料性附录) 发电厂事故紧急抢修单格式 55附录 D(资料性附录) 发电厂工作任务单格式
收藏
编号:30608373
类型:共享资源
大小:3MB
格式:DOC
上传时间:2019-09-01
0
金币
- 关 键 词:
-
QGDW1799
2015
国家电网
公司
电力
安全
工作
规程
第三
部分
水电厂
动力
- 资源描述:
-
ICS 29.240
Q/GDW
国 家 电 网 公 司 企 业 标 准
Q/GDW 1799.3 — 2015
国家电网公司电力安全工作规程 第三部分:水电厂动力部分
State Grid Corporation of China working regulations of power safety part 3: Hydropower and machine section
2015 - 04 - 10 发布 2015 - 04 - 10 实施
国家电网公司 发 布
1
Q/GDW1799.3 — 2015
目 次
前言········································································································································································ Ⅱ
1 范围···································································································································································· 1
2 规范性引用文件················································································································································ 1
3 术语和定义························································································································································ 1
4 总则···································································································································································· 1
5 保证安全的组织措施········································································································································ 2
6 保证安全的技术措施······································································································································ 11
7 一般安全措施·················································································································································· 13
8 水轮机(水泵)的工作·································································································································· 17
9 水轮发电机(电动机)的工作······················································································································ 21
10 热工元器件的工作········································································································································ 22
11 水工金属结构················································································································································ 23
12 电站公用辅助设备········································································································································ 25
13 水工工作························································································································································ 28
14 起重与运输···················································································································································· 32
15 高处作业························································································································································ 41
16 焊接、切割和热处理作业···························································································································· 46
附录 A(资料性附录) 现场勘察记录格式································································································ 51
附录 B(资料性附录) 发电厂水力机械工作票格式······················································································ 52
附录 C(资料性附录) 发电厂事故紧急抢修单格式······················································································ 55
附录 D(资料性附录) 发电厂工作任务单格式···································
展开阅读全文

文档分享网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。